Installation Check list

Installation Check list
Removed Plastic Cover from LCD.
Removed Plastic Cover from Power Adapter.
Adapter is connected with three point power cable.
Checked electrical socket with line fault detector. - Line is grounded
Checked Real Time Noise. - Below 20mV
Checked Level Gauge. - Bubble in red circle
Checked the printer alignment.
Connected to Internet. *Optional
Operational Training Checklist
Unboxing and Boxing Training Provided.
Explained machine should only be used in places where power is stable.
Explained should not use an extension cord that does not meet the standards.
Explained precautions when InBody Test.
Basic preventive maintenance training provided.
Explained that costs may be charged for repairs due to external physical damage even under warranty.
Explained the QR code sticker.
Explained that due to use in an unstable voltage environment (moving the machine without inspection by an InBody engineer, using substandard
Installation of LookinBody 120 Explained. *Optional
Measurement Checklist
Explained reason behind weight fluctuations and weight differences in different machine.
Explained the 1% PBF difference is normal in 3 consecutive test and reason behind it.
The installer fully explained the above contents and the recipient understood them.